Home improvements 2007
Installed 3600 sq ft of new carpeting

3600 sq. ft. of new carpet installed
November, 2007
Completely remodeled the kitchen

Three photos of the kitchen prior to renovation.

Concept drawing of new kitchen layout
with free standing pantry at left, island eating bar center and
kitchen cabinets/appliances at right

Floor plan for new kitchen

New cabinets arrived December 6th. Charlie
(red pencil in ear) and David started installing them that afternoon.

Kitchen completed just
in time for Christmas!
Remodeled the master bathroom

Completed at the same time as the kitchen
Partially remodeled the upstairs guest
bathroom
Repainted several interior walls

Painting in progress
Installed new curtains/draperies in foyer,
dinning room, family room, kitchen and downstairs offices
Restored wood floors in kitchen and foyer
Installed exhaust fan for electric range
All track lighting removed and replaced with
table/floor lamps, chandeliers and spot lights
Home improvements 2008:
Cleared undergrowth from adjacent wooded area
Built
new brick mailbox

04/18/08 - completed brick mail box with rock cap, newspaper holder and
pineapple shaped finial.
Remodeled the
front porch

Before...

After...
04/25/08 - Finished this project including removal
carpeting/particle board underlayment, painting the
plank floor, replacing the light fixtures and installing
a wicker porch swing.
Remodeled the
landscape

Before...
.


After...
05/01/08 - Finished the front and back landscaping
with stone barriers, perennials/annuals and cypress mulch.
Added board and
batten shutters to the front of the house

Before...

After...
05/03/08 - Finished installing four sets of shutters
made from fence boards painted the same color as the
window trim.
Installed false
dormer windows on the garage

Before....

After...
05/04/08 - Finished installing three "false" dormer
windows fabricated from wood and glass.
Landscaped
the area between garage and pond
Painted
the interior of the six car garage including ceiling, walls and
floor.
06/16/08 - Completed
Erected
a 25 ft aluminum flagpole.

Digging a 2' X 2' X 3' deep hole for the concrete
foundation.
08/20/08 - Completed |
Note:
Labor for all improvements was provided by Don and Pat except
kitchen, master bath and carpet.